Specialist HVAC Product Solutions
Whitelees Wind Farm

Case Study: Whitelees Wind Farm


End User: Scottish Power

Contractor: Think Energy

Completion: April 2022

Supply Partner: Stulz / Clivet / Panasonic


Whitelees Battery Storage

This project highlights the advantage of an Independent HVAC product solutions company that can bring a number of major maufacturers to a single project.

DFM engaged with the design team , BSDA, at a very early stage on the project and called on our supply partners to develop solutions for various aspects of the project. 

The battery cooling system included 2 x Stulz Explorer packaged air cooled chillers with free cooling rated at 654 kW & 782 kW  operating on semi hermetic screw compressors and R513A refrigerant, 2 x 76.5 kW Elfo Energy Air Source heat pumps. All of the cooling / heating plant has onboard pump sets and connected to 2 x 10,000 ltr stainless steel buffer tanks and managed by a Cyberhub control package linked to the clients BMS system to control the temperature of the tanks.

The main Battery hall has 2 x Panasonic 40kW 2 pipe VRF systems with 4 way blow cassette indoor units and the SCADA Room has 3 x 7 kW PACi NX cassette systems connected to a modbus interface.